EMERALD BUILDING SERVICES - MULTIPANEL Internal Wet Area Waterproofing System

01 November 2017

PROJECT: 

MULTIPANEL Internal Wet Area Waterproofing System

Langwarrin, Victoria

Emerald Building Services

FROM THE INSTALLER

‘It was an easy choice based on the fact that MULTIPANEL is 100% waterproof, easy to install with no special tools required and the project was able to be fast tracked by 2 weeks due to less tradesmen needed for installation, and no waterproofing/screeding is required.’

Tim Greenham, Emerald Building Services

PROJECT OUTLINE

  • Complete renovation of both existing ensuite and bathrooms
  • Project needed to be complete within a short time frame

THE SOLUTION

  • To use the complete MULTIPANEL internal wet area system consisting of; Custom made shower bases, 12mm wall panels, 8mm floor underlay andshower niches
  • To use the complete MULTIPANEL internal wet area system consisting of; Custom made shower bases, 12mm wall panels, 8mm floor underlay andshower niches
  • All the above enabled a significant time saving, cost effective solution rather than using existing methods that may fail
  • Pre-formed custom-made shower bases and niches for easy installation

BENEFITS FROM USING MULTIPANEL

With completely customisable shower bases and shower niches, arriving on site ready to install along with the floor and wall panels the ensuite and bathroom become 100% waterproof in a short space of time saving the builder time and money.

It also allows homeowners the freedom of designing their wet areas to suit themselves with our custom made base and niche series.

100% WATERPROOF:

Being 100% waterproof gave the builder and home owner piece of mind that the ensuite and bathroom will remain waterproof indefinitely.

LIGHTWEIGHT:

With each 2400 x 1200mm sheet of MULTIPANEL 12mm panels weighing 7.2kg and the8mm weighing just 5.2kg each, this gives rise to significant OH&S; advantages and was much easier to use for the builders on site.

TIME OF INSTALL:

The MULTIPANEL system installs incredibly quickly compared with traditional methods. It enabled the project to be fast tracked by a whole 2 weeks.